Haylo Construction responded to a call regarding a dock that was settling and experiencing separation issues. We collaborated closely with a skilled engineer to develop an effective solution. The job scope involved cutting precise holes in the existing dock structure and filling the voids below with lean concrete to enhance stability. Additionally, we installed large diameter steel reinforcements to prevent any further separation, followed by the installation of a robust 7-inch cap reinforced with microfiber mesh and rebar for added durability.